General

Windows and doors must be stored undercover avoiding any water penetration. Before installation begins, all windows and doors must have at least one base coat of stain or paint. (This applies to all edges of sash and frame

Windows and doors must be stored undercover avoiding any water penetration.

Installation

Before installation begins, all windows and doors must have at least one base coat of stain or paint. (This applies to all edges of sash and frame)

Installation

Windows

Place window in opening on packers at maximum 1200mm centres. A packer must be placed at each end and under any mullions. Place packer behind each fixing point (1No. 100mm from top and 1No. 100mm from bottom and at centres no more than 1000mm) on the vertical frames. Side frames must be straight.

Installation

All windows must be level

Installation

On deadlights the packers must be placed 100mm from the outside of the frame.

Windows wider than 1800mm and windows with multiple sashes must have a fixing to the frame head of each sash. Never fix through the vent slot.

Installation


Before the window is firmly fixed ensure the sash is centred within the frame.

Installation

After final fitting and also prior to hand over to client open and fully reverse the window. Ensure the window reverses smoothly and locks in the cleaning position.

Installation

If foam is used to seal around windows, the frame must be braced. Also the correct quantity used and the correct temperature in accordance with manufacturers instructions.

Installation

Doors

Ensure the surface the door is to be placed upon is level and flat.

Installation

Place packer behind fixing points above top hinge, below bottom hinge and in the centre of the doorframe. If an extra fixing is required, this should be placed above the middle hinge. Place packer behind fixing points, 100mm from top, 100mm from bottom and above or below the lock keep.

N.B. Doorjambs must be straight and plumb.

Installation


To the head of the doors the margin must be even or slightly smaller at locking side.

Installation

Before the door is firmly fixed ensure that the margins are even down hinge and locking side.

Installation

After final fixing and prior to hand over to the client ensure that doors open and close freely, locks, handles, espagnollette, stays and shootbolts are in good working order.

For correct fitting of french door handle please refer to separate fitting instructions.

Installation

If foam is used to seal around doors, the frame must be braced. Also the correct quantity used and the correct temperature in accordance with manufacturers instructions.

Installation

Note

We reserve the right to void our guarantee if the products are not fitted and maintained in accordance with Broxwood's instructions.